Bathroom renovation with new underfloor heating
Location: Schrassig
Year: 2017
Services: Bathroom renovation
Description: “We don’t like it any more” – those were the first words our employee heard at the first visit when he asked why the clients wanted to renovate their bathroom. Dated over the years and tiled in moss green, the bathroom was used more as a storeroom. The shower, too small and with too high a step, was to make way for a large walk-in shower oasis with a rain shower. The layout of the building allowed us to modify the waste-water connection in the boiler room below, so the shower could be built completely flush with the floor. The washbasin and bathroom furniture area was then completely redesigned. After two short appointments in the showroom this hurdle too was quickly overcome: the bathroom now has a beautiful double washbasin with a vanity unit and an illuminated mirror cabinet, as well as an additional make-up mirror with integrated lighting.
So that you can relax in a pleasantly warm bathroom, underfloor heating was also installed when the floor covering was replaced. Thanks to the existing heating pipes it could be connected without any problem, and in spring and autumn the client can choose between the existing radiators and the underfloor heating.







